Nexans Low Voltage Cable will be Supplied for Karbala Refinery Project

2015-06-29

Iraq’s National Oil Company will rely on Nexans low voltage power cable to construct Karbala refinery project. The contract awarded a cooperative enterprise HDGSK composed of four South Korea engineering general contracting companies. The four South Korean companies are respectively Modern Engineering Construction, Modern Engineering, GS Engineering Construction and Sk engineering construction. As a part of the contract Nexans will manufacture and supply 3500 kilometers low voltage power cable to the project.

power cable supply
Nexans Low Voltage Cable Supplied for Karbala Refinery Project

Nexans low voltage cable will have the high performance of Polyvinyl chloride (PVC) carbon oxides. According to the professional technology Nexon successfully satisfies the technical requirements of users.

All the low voltage cable supplied would be manufactured in the Nexans factories located South Korean and Turkey. The delivery time will begin in January 2016. And to estimate the productive task would be finished in March 2017.